Page 24 - ZEB AnnualReport 2015
P. 24

POWERHOUSE KJØRBO







       Bjørn Jenssen (SKANSKA)


       The project Powerhouse Kjørbo consists of   One of the goals of the project was to make   equivalent electricity through the use of
       a total refurbishment of two ofice blocks in   an energy positive building by compensating   the primary energy factors throughout the
       Sandvika, Norway. The original buildings were  for the energy demand for the production of   buildings’ expected lifetime .
                                                                                                 2
       built in 1979, scenically situated close to the   materials and components, construction, and
       outlet of the river Sandvikselva.   energy for operation. As well as end-of-life   The equivalent yearly embodied electricity for
                                          treatment with on-site production of renewable  all materials used throughout the buildings’
       Powerhouse Kjørbo is the irst project to be   energy. Another important goal was the   expected 60 year lifetime (after total
       realized by the Powerhouse Collaboration,   achievement of BREEAM outstanding, with   refurbishment) is estimated to be 61,716 kWh/
       consisting of Entra Eiendom, Skanska,   a good indoor environment as one of several   year (11.91 kWh/m /year).  The equivalent
                                                                                           2
       Snøhetta, the environmental NGO ZERO, the   objectives. In addition, proitability was a key   yearly embodied electricity for the construction
       aluminium company Hydro, the aluminium   objective for all the parties involved in the   and transport of materials is calculated to be
       proile company Sapa, and the consulting   project.                     7,082 kWh/year (1.37 kWh/m /year).
                                                                                                   2
       irm Asplan Viak. The main objective of the
       Powerhouse Collaboration is to demonstrate   Life cycle analysis was used to establish the   The measured irst year energy demand
       that proitable, energy-positive buildings are   primary energy balance. It was used actively   for operation and the energy production
       possible - also in Norway.         throughout the interdisciplinary and iterative   matches well with calculated values from
                                          design process to ensure decision making   design. Total measured irst year energy use
       Refurbishment work started March 18. 2013   based on a lifecycle perspective . 1  for ventilation, space and tap water heating,
       and the project was completed and handed                               cooling, ventilation, and circulation pumps
       over on February 5. 2014. The total heated   Embodied energy as well as energy used   was 122,542 kWh (23.65 kWh/m ) while the
                                                                                                     2
       loor space that was renovated is 5,180 m .    during construction and for transport of   predicted irst year use was 121,947 kWh
                                     2
                                          materials is calculated as primary energy,   (23.54 kWh/m ). When adding energy use for
                                                                                        2
                                          but it can be converted to average yearly   plug-loads, the measured energy use adds


        24    ZEB annual report 2015
   19   20   21   22   23   24   25   26   27   28   29